Monday, March 31, 2008

Week 8 Log

I've finalized all the designs and sent them to the director, club advisor, and mentor. They each had a couple of things that I should change on the designs. The alterations were minor and I have fixed them all.

Thursday, March 20, 2008

Week 7 Log (2)

I finished all of my designs, including three ticket options. I've posted them all on my blog, turned in my press release, and I'll be getting ready for my final presentation over break. FINALLYYY DONNEEE. !

Tuesday, March 18, 2008

Ticket Designs




Above are the three designs for the tickets.

Playbill Design

Above is the design for the playbill.

Flier Designs


Above are the designs for the two fliers which will be printed out. The times and prices are tentative and will be changed if necessary.

Basic Designs


Above are the designs which will be used on the Tshirts, Fliers, Programs, and Tickets for the play.

Monday, March 17, 2008

Week 7 Log

My press release is almost done, I'm working on the summary right now and the placement of pictures. I finished the playbill design today, including the white around the border. I have to finish the ticket designs still.

Friday, March 14, 2008

Week 6 Log (2)

I changed the shape of the rose on the black design from pointed to swirled petals. I created both fliers and have almost completed the playbill design. I just need to modify it a little to make it look more professional. I'll do that Monday.

Monday, March 10, 2008

Week 6 Log

I changed the boldness of the writing on both of my designs using Photoshop and rearranged the placement of the letters and flowers on the designs. I spoke with the club advisor and he told me that I need to include the authors of the music, lyrics, and book on the designs (according to the script company we purchased from). I'll include these in the final designs this week.

Friday, March 7, 2008

Week 5 Log (2)

I have all of my information together for my press release. I sent my designs to my mentors and they've both told me the things that are good and what should be changed/modified. I'll be doing this next week.

Tuesday, March 4, 2008

Week 5 Log

I am beginning my press release assignment this week. I'm gathering my old work together (information about research, background on the project, developmental work, and final designs).